Fence posts & panels calculator

Post and panel count for a straight fence run. Enter your project measurements to estimate panels required, include a practical waste allowance and produce an order-ready quantity.

Use the free fence posts & panels calculator
Free to useMetric & imperialNo sign-upFormula explained

Measurements needed

Measure the finished project rather than relying only on nominal plan dimensions. Enter all values using the units displayed by the calculator.

01Fence lengthDefault example: 18. Replace this with the measured project value and check the displayed unit.
02Panel widthDefault example: 1.8. Replace this with the measured project value and check the displayed unit.

How to calculate panels required

Divide the overall run by the chosen spacing, round up, and include the closing post.

RESULTPanels requiredDisplayed as panels. Countable products are rounded up because partial packs, boards or sheets normally cannot be purchased.

Allow for end, corner and gate posts separately, and confirm how ground conditions change post depth or concrete use.

Worked estimating example

Begin with the example values shown beside each input, then replace them with your own measurements. Check that every dimension uses the same measuring system. Apply a waste allowance that reflects cuts, breakage, spillage, matching batches and site access. The calculator then reports the estimated panels required in panels.

Before buying, compare the result with the manufacturer’s current pack coverage or yield. If products are sold only in full packs, order the next whole pack rather than rounding down.

Metric, imperial and regional use

Choose your country in the main calculator to set familiar terminology, the usual measurement system and currency context. Material sizes, pack coverage and installation rules vary, so confirm the result against the product sold in your location.

Common estimating mistakes

  • Mixing metric and imperial values in the same calculation.
  • Using nominal product dimensions instead of actual coverage or installed size.
  • Rounding intermediate values too early or rounding the final order down.
  • Applying a generic waste percentage without considering the layout and cutting pattern.
  • Treating a material estimate as structural design or regulatory approval.

Frequently asked questions

How much waste should I add?

Use the smallest allowance justified by the real layout. Straight, repetitive work may need less; diagonal patterns, complex cuts, fragile materials and matching batches usually need more. The DIY and Trade settings are starting points, not fixed rules.

Does the calculator replace a supplier quotation?

No. It provides an independent preliminary estimate. Verify current product dimensions, yield, pack coverage, minimum order quantities and delivery constraints with the supplier.

Can I use the result for regulated or structural work?

Use it only for initial material planning. A competent designer, installer or relevant authority should verify safety-critical dimensions, structural capacity and compliance.